Gallery
A new atmospheric, cast iron, hydronic boiler installation.
New drains and water lines for a three piece bath.
Main valve replacement in a meter vault.
Wiring an ultra-high efficiency hydronic boiler.
A new cast iron no-hub building drain and stack.
Building a large new cast iron sectional boiler with multiple pumped zones.
A new cast iron, atmospheric steam boiler installation.
A multiple zone hydronic heating system.
A new Chloraloy custom shower pan.
Replacement of clogged cast iron building sewer.
A five zone hydronic heating system piped in the “pumping away” method.
New Aqua-pex water lines for the new bathrooms.
New drains and water lines for a three piece Warner West town house.